The 58,000 sq ft site included all external drainage, all external service ducting, piled and traditional foundations, bulk excavation, in situ and pre-cast concrete works – including retaining walls to a height of 12 metres – concrete slabs in new and existing structures, high specification paving and Section 278 Works.